Solar Plant Installation Timeline
The installation timeline depends on the size of the plant and the equipment included.
Typically, installing a standard solar plant takes up to five days.
For larger plants with a greater number of panels, a battery, and a back-up box, the work may take several additional days.
Installation Stages
Day 1 — assembly of the support structure, laying of DC cables, and grounding from the panels to the house.
Day 2 — installation and fastening of the solar panels, and the start of equipment setup.
Remaining days — installation of the equipment (inverter, batteries, back-up box), system connection, and configuration.
Possible Particularities
Sometimes special situations arise. For example, when the structures and panels have already been delivered, but the equipment (inverter, batteries, etc.) is still in transit. In such cases, we can carry out the installation in stages: first installing the structures and panels, and then, once the equipment arrives, returning to complete the setup.
This approach helps save time and allows for a faster transition to the final commissioning of the plant.